Commercial painting is a scheduling and coordination problem that happens to involve paint. The coating decisions are the easy part. The hard part is finishing an occupied office suite without a single tenant complaint, repainting a 200-unit apartment community on a phased schedule that doesn't strand residents, or turning a restaurant dining room between a Sunday close and a Tuesday open.
We work nights, weekends, and phased sequences as a matter of course. We coordinate with facility managers, GCs, HOA boards, and tenants directly. We carry $2 million in general liability, provide certificates of insurance on request, and produce the documentation your procurement process requires without being chased for it.
Every commercial project is custom-quoted. What follows is how we scope, sequence, and price them.
Commercial Properties We Paint
Different property types have genuinely different constraints, and the constraint — not the square footage — is what drives the approach.
- Office and professional buildings. Occupied suites, common areas, corridors, stairwells, and lobbies. The constraint is tenant disruption, so most of this work happens after 6pm or on weekends. Low-odor and zero-VOC products are standard here, not an upgrade.
- Retail. Sales floors, stockrooms, and exteriors. The constraint is trading hours and brand color standards. Overnight turns are routine, and we work to spec sheets when a national brand supplies them.
- Restaurants and hospitality. Dining rooms, bars, kitchens, and back-of-house. The constraint is the close-to-open window and health department requirements. Kitchen and prep areas need washable, cleanable coatings that survive daily sanitizing.
- Multi-unit residential and apartment communities. Unit turns, corridors, stairwells, and building exteriors. The constraint is resident access and turn deadlines. We work off turn schedules and hit them.
- HOA and community associations. Building exteriors, clubhouses, fencing, and common structures. The constraint is board approval cycles, reserve study budgets, and owner communication. We provide the documentation boards need and can present to them directly.
- Warehouse and industrial. Structural steel, mezzanines, safety marking, and epoxy floor coatings. The constraint is operations — we work around production and shipping schedules rather than asking them to stop.
How We Keep Your Property Operating
Every commercial bid we write starts from the same question: what can't stop? The answer shapes everything downstream.
- After-hours and overnight scheduling. Standard on occupied office and retail. Crews are briefed, keyed or badged in, and the space is returned to full working order before opening. Nobody arrives Monday to find drop cloths and taped-off desks.
- Phased zoning. For large properties, we divide into zones and complete them sequentially — a floor, a wing, a building — so only a defined section is ever affected and everything else operates normally.
- Low-odor and zero-VOC systems. Standard for occupied spaces, healthcare, and schools. This is what makes same-day reoccupancy possible and it's the single most common reason facility managers switch contractors.
- Single point of contact. One person who knows your property, your access requirements, and your schedule. Not a rotating dispatcher.
- Documented daily progress. You get a written record of what was completed, what's next, and anything discovered. Boards and asset managers need this for their own reporting, and we'd rather produce it than be asked.
Most of the hours go in before the first finish coat.
Our Commercial Painting Process
Commercial work runs on documentation and sequence. Here's how a project moves from first call to closeout.
- 01
Site Walk and Scope Definition
1–3 hours, freeWe walk the property with you, document existing conditions, identify substrate types and any coating failures, and — most importantly — establish the operational constraints. What hours are available, what can't be disturbed, what access and security requirements apply, what the deadline is driven by. Scope gets written from those constraints, not despite them.
- 02
Detailed Written Proposal
2–5 business daysLine-item scope by area and surface, specified products with manufacturer data sheets, coat counts, surface preparation methodology, schedule with phase dates, and price. Formatted for a procurement process or a board packet. Certificates of insurance, W-9, and license verification included in the package rather than requested later. If you're running competitive bids, this is written to be compared line against line.
- 03
Pre-Construction Coordination
1–2 weeks before startAccess, keys, badges, alarm codes, and parking sorted. Tenant or resident notification letters drafted for you to distribute. Any other trades sequenced. Elevator and loading dock reservations made. Color approvals confirmed in writing, including brand standard sign-off where a national spec applies. Nothing about the first day should be a surprise to anyone in the building.
- 04
Protection and Containment
First shift of each phaseFloors, furniture, equipment, and finished surfaces protected. Containment established for any work generating dust or overspray. In occupied and healthcare environments, negative-air containment where required. Signage and wayfinding installed so building occupants know what's happening and where to walk.
- 05
Surface Preparation
Varies by scopePressure washing on exteriors, degreasing on interiors, scraping and sanding of failed coatings, drywall and substrate repair, caulking and sealing, and full priming. On industrial substrates this may extend to mechanical abrasion or specialized surface profiling per the coating manufacturer's spec — and where a spec exists, we follow it and document that we did.
- 06
Coating Application
Per phase scheduleSpray, roll, or brush selected per surface and per environment. Two finish coats standard. Wet-film thickness checked against spec on industrial and warranty work. Each phase returned to full operational condition at the end of each shift — not at the end of the phase.
- 07
Phase Inspection and Punch List
End of each phaseYou walk each completed phase with our lead before we move to the next one. Deficiencies get corrected inside that phase rather than accumulating into a closeout punch list that takes three weeks to clear.
- 08
Closeout and Documentation
Project completionFinal walkthrough and sign-off. As-applied color and product schedule by area, so your next facility manager knows exactly what's on every wall. Warranty documentation. Touch-up material labeled and stocked on site. For HOAs, a summary suitable for the board packet and reserve records.
Lifts, ladders and staging — whatever the elevation needs.
Commercial Painting Costs in Western Washington
Commercial work is custom-quoted — square footage alone doesn't determine cost, and any contractor giving you a per-square-foot number over the phone hasn't asked the questions that matter. These ranges are for orientation while you build a budget.
| Project Scope | Typical Range | Notes |
|---|---|---|
| Single office suite, 1,000–3,000 sq ft | $2,500 – $8,000 | Walls, ceilings, doors, and trim |
| Office floor or common areas | $8,000 – $25,000 | Corridors, lobbies, stairwells |
| Retail interior | $4,000 – $20,000 | Varies heavily with fixtures and brand spec |
| Restaurant interior | $6,000 – $25,000 | Dining, bar, and back-of-house coatings differ |
| Apartment unit turn | $400 – $1,200 per unit | Volume pricing on multi-unit contracts |
| Building exterior, multi-unit or HOA | $15,000 – $150,000+ | Scoped by building count and elevation |
| Epoxy floor coating | $4 – $12 per sq ft | System depends on traffic and chemical exposure |
What Moves the Number
- Schedule constraints. After-hours and overnight work carries a premium. It's usually still cheaper than the revenue lost to a daytime shutdown, and we'll help you run that comparison honestly.
- Substrate condition. Failed coatings, previous bad applications, and industrial surface prep requirements can exceed application cost entirely.
- Access and height. Lifts, scaffolding, and swing stage on mid-rise exteriors are a real line item, not a rounding error.
- Coating specification. Standard commercial acrylic, high-performance epoxy, and intumescent or specialty systems span an enormous price range.
- Occupied versus vacant. Vacant space can be sprayed and runs dramatically faster. Occupied space requires containment, daily reset, and lower-odor product.
- Contract term. Multi-year maintenance agreements and multi-building portfolios price better than one-off projects, and we'd rather have the relationship.
Commercial Coating Systems
Product is specified per environment and per performance requirement. We'll supply manufacturer data sheets for anything on your project.
| Application | Product | Why |
|---|---|---|
| Office and general interior | Commercial acrylic, eggshell or satin | Scrubbable, holds up to corridor traffic and janitorial cleaning |
| Occupied space, healthcare, schools | Zero-VOC low-odor acrylic | Enables same-day reoccupancy — usually the whole reason a schedule works |
| Restrooms, kitchens, food service | Epoxy-modified or high-performance acrylic | Survives daily sanitizing and constant moisture |
| High-traffic corridors and stairwells | Acrylic-urethane enamel | Resists scuffing, cart impact, and repeated cleaning |
| Warehouse and industrial floors | Epoxy or polyaspartic floor system | Chemical resistance, forklift traffic, and safety line integration |
| Structural steel and industrial substrate | DTM or epoxy-mastic systems | Corrosion protection where downtime for recoating is expensive |
| Multi-unit and HOA exteriors | Premium exterior acrylic | 8–10 year cycle in this climate, which is what a reserve study is planning around |
We work to submitted specifications and brand standards when you have them. When you don't, we'll write one — and you'll own it for your records.
Commercial Painting Services We Offer
Our own crew, our own equipment, photographed mid-job.
What Every Commercial Proposal Includes
- Site walk and documented existing-condition assessment
- Line-item written scope by area and surface
- Specified products with manufacturer data sheets
- Phase schedule with committed dates
- Certificate of insurance, W-9, and license verification
- Tenant and resident notification support
- Full protection, containment, and daily site reset
- Phase-by-phase inspection with your representative
- As-applied color and product schedule at closeout
- Written workmanship warranty and stocked touch-up material
Quoted Separately
- — Structural, drywall, and substrate repair beyond normal prep
- — Lift, scaffolding, and swing stage rental on high-access work
- — Asbestos and lead abatement — coordinated with licensed abatement contractors
- — Flooring, glazing, and other trades
- — Permits and right-of-way closures where a jurisdiction requires them
- — Emergency and expedited mobilization outside the agreed schedule
Commercial Project Timelines
| Project Scope | Typical Duration |
|---|---|
| Single office suite | 2–5 days, often over a weekend |
| Office floor or common areas | 1–3 weeks, phased |
| Retail or restaurant interior | 3–10 days, typically overnight |
| Apartment unit turns | 1–2 days per unit, run in parallel |
| Multi-building exterior | 4–12 weeks, weather-dependent |
| Warehouse floor coating | 3–7 days including cure |
Exterior commercial work is subject to the same May-through-October weather window as residential. HOA and multi-unit exteriors book out well in advance for that season — boards approving a summer project should be soliciting bids in the winter, not in May.
What's Included
Trim, fascia and every awkward edge, cut by hand.
Commercial Painting Across Snohomish and King County
We work commercial across three counties, and each submarket has its own mix:
Class A office and retail with tenant improvement cycles and brand standards. Overnight and weekend work is the norm here, not the exception.
Mixed-use, restaurants, and older commercial buildings with substrate conditions that need real assessment before a coating spec can be written.
Industrial and warehouse facilities, including structural steel, safety marking, and epoxy floor systems around active operations.
Retail corridors and multi-unit residential along Highway 99 and around the City Center. Unit turns and building exteriors are the bulk of it.
Office campuses and newer multi-unit developments, typically running on tight tenant improvement schedules.
Warehouse and distribution facilities where the constraint is production and shipping schedules — we work around them rather than asking them to pause.
We serve 24 cities across Snohomish, King, and Pierce County. Find your city or call to discuss a portfolio across multiple sites.
Why Choose Paint Gunners for Commercial Painting?
We use professional airless and HVLP spray equipment for factory-smooth finishes that no brush or roller can match.
We spend the majority of our hours on prep — cleaning, repairing, priming, and protecting — because that is what determines how long the finish lasts.
Commercial-grade coatings selected per surface and per exposure — not whatever was cheapest at the counter.
We don't leave until you're happy. Full walkthrough inspection with touch-ups included on every project.