The most common question we get on cabinet work is not about colour or cost. It is “how long will I be without my kitchen?”
The short answer: three to five days for a typical kitchen, and you keep the room for most of it. You lose the doors, not the kitchen. But what happens in those days matters, because almost every cabinet finish that fails early fails for a reason you could have spotted in the process.
Here is the actual sequence on a cabinet refinishing job.
Before Day One: The Assessment
This happens at the estimate, and it decides whether the job should happen at all.
We open doors and check the boxes, particularly under the sink. Water-damaged particleboard is swollen, soft at the edges, and sometimes crumbling. Paint does not consolidate it and refinishing it is money wasted. If that is what we find, we say so.
We count doors and drawer fronts, because that is what the price is built from, not kitchen square footage. We identify the existing finish, which decides the primer. And we look at whether the wood is open-grained oak, because that leads to the one decision you have to make up front.
The oak question. Oak has deep open grain. Paint does not fill it, so a painted oak door still reads as oak texture under the colour. Some people like that. If you want a modern smooth slab look, the grain has to be filled first, which adds one to two days and real cost. Deciding this at the estimate rather than on day three is much cheaper.
Colour and sheen get confirmed on a sample door, not a chip. Cabinet colour behaves differently from wall colour because the sheen is higher and the surfaces are vertical, horizontal and shadowed all at once.
Day One: Removal, Degreasing, Sanding
The longest day, and none of it looks like progress.
Everything comes off. Every door, every drawer front, all hinges, all pulls. Each one is labelled to its exact opening. This matters more than it sounds: cabinet boxes are rarely perfectly square after fifteen years, and a door that fits opening 14 may not sit right in opening 12.
Anyone who tells you they will spray the doors in place is telling you the finish will have brush-adjacent texture, runs on the vertical faces, and overspray on your hinges. Doors come off. It is not negotiable.
Degreasing. This is the step that separates a cabinet job that lasts from one that peels at the handles in eighteen months. Kitchen cabinets carry years of aerosolised cooking oil, heaviest around the range and above it. It is invisible. Nothing bonds through it. We wash every surface with a dedicated degreaser and change the water often, because wiping grease around is not removing it.
Sanding. Every surface gets scuff-sanded. Not stripped, scuffed, which gives the primer something mechanical to grip. This is the other step that gets skipped, and the two skipped steps compound: grease plus a glossy unsanded surface is a finish that comes off with a fingernail.
Dents, chips and worn edges get filled and sanded flush now, while it is cheap.
Day Two: Primer
Primer selection is substrate-specific and it is not interchangeable.
Melamine or thermofoil gets a bonding primer, because that surface is plastic and nothing else will stick to it. Bare wood or MDF gets shellac-based primer, which blocks tannin and old stain from bleeding up through the colour. Previously painted depends on what is under there, and latex over old oil is the case that sometimes requires more aggressive work than scuffing.
Doors and drawer fronts are primed flat in a controlled area. Boxes are primed in place, with masking that should cover your counters, appliances, floors and the openings into adjoining rooms. Overspray travels further than people expect.
Primer is also diagnostic. It is the first time the surfaces are one uniform colour, and every remaining dent, scratch and proud filler edge becomes obvious. Those get fixed before colour goes on, not after.
Days Three and Four: Finish Coats
Two coats, sprayed, with a light sand between them.
We use HVLP spray equipment with either catalysed lacquer or a waterborne enamel, depending on the kitchen. Both cure to a hard film. Neither can be reproduced with a brush or a roller, and that is the whole reason sprayed cabinets look like factory cabinets.
Doors are sprayed flat and left flat to level out. This is why they are not back on your boxes yet, and why a job that promises doors back on day two is skipping cure time.
Your kitchen is usable through this. You have boxes with no doors, which is inconvenient and perfectly functional. Plan on takeout the evening the boxes are sprayed, mostly because of the smell and the masking rather than any real hazard.
Day Five: Cure, Rehang, Adjust
Cure is not the same as dry. The finish is dry to the touch in hours and fully hardened in days. Doors get rehung once the film can be handled, and the finish keeps hardening for roughly a week to two weeks after that.
What that means practically:
- Close doors gently for the first week
- Do not line shelves with contact paper or liners for two weeks, because they can print into the finish
- Do not stack dishes directly on freshly finished shelf surfaces for a week
- Wipe spills rather than scrubbing them for the first two weeks
Nobody warns homeowners about this, and it is the cause of most “the finish marked right away” complaints.
Hinge adjustment is the last real step and the one that distinguishes a finished job. Every door gets adjusted so the gaps are even and the faces are flush. Hardware goes back on, or new hardware goes on. Soft-close conversion, if you want it, is the obvious moment, because the doors are already off and the hinges are already out.
Then a walkthrough with the light on, looking at it from where you stand in the room rather than from eighteen inches away.
Timeline at a Glance
| Phase | Duration | Kitchen usable |
|---|---|---|
| Removal, degrease, sand | 1 day | Yes, doors off |
| Primer | 1 day | Mostly, masking in place |
| Finish coats | 1–2 days | Mostly |
| Cure and rehang | 1 day | Yes |
| Grain filling, if oak | Add 1–2 days | Yes |
Add a day or two for a large kitchen, an island, or a kitchen with built-ins and a pantry on the same scope.
What Should Be in the Quote
The lines that should be itemised, because they are the ones that get quietly dropped: door and drawer count, degreasing, sanding, primer named by product, number of finish coats, hardware removal and reinstallation, hinge adjustment, and masking and protection of counters, floors and appliances.
If a cabinet quote is a single number with no door count in it, you cannot compare it to anything.
Costs by kitchen size, and where refinishing stops making sense against replacement, are in our cabinet painting vs. replacement guide. Current colour choices are in our Eastside cabinet trends guide.
If the kitchen walls are getting done too, price them together under interior painting. Fresh wall colour makes dated cabinets look worse, and one mobilisation costs less than two.
Schedule a free cabinet assessment or call (206) 930-8885. We serve Kenmore, Shoreline, Lake Forest Park, Renton, Kent, Federal Way and 23 cities across Snohomish and King County.